Perencanaan dan Pengendalian Proyek dengan Metode Pert - CPM Studi Kasus : Fly Over Ahmad Yani – Karawang

Authors

  • Anggara Hayun A Pengajar Jurusan Teknik Industri, Fakultas Teknik UBINUS

DOI:

https://doi.org/10.21512/tw.v6i2.605

Keywords:

planning, controlling, project, pert - cpm method

Abstract

The efficiency and effectivity is not a new guide in this global era. As a professional and innovative company, like consultant construction company that always makes customer satisfy, has a good achievement and reputation. There fore, efficiency and affectivity are necessary needed in a company. Article gives some inputs how to manage time become more effective and efficient in finishing project with CPM method. With using CPM method in “fly over project Ahmad Yani-Karawangâ€, is figured out the optimal time to finish this project which is 184 days.


Keywords: 

Dimensions

Plum Analytics

References

Dimyati, Tjuju Tarliah. 2002. Operation Research. Bandung: Sinar Baru Algensido.

Siswoyo, 1985. Pokok-pokok Manajemen PERT dan CPM. Jakarta: Erlangga.

Subagyo, Pangestu, Marwan Asri, dan T. Tani Handoko. Buku Dasar-Dasar Operations Research. Yogyakarta: Penerbit BPFE.

Downloads

Published

2005-09-30

How to Cite

A, A. H. (2005). Perencanaan dan Pengendalian Proyek dengan Metode Pert - CPM Studi Kasus : Fly Over Ahmad Yani – Karawang. Journal The Winners, 6(2), 155–174. https://doi.org/10.21512/tw.v6i2.605
Abstract 4820  .
PDF downloaded 6266  .

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.