ANALYSIS OF THE PRODUCTION PROCESS AT PT TBA.ALAM SUTERA USING THE VALUE STREAM MAPPING METHOD
PDF

Keywords

Lean
Value Stream Mapping
line balancing
unnecessary motion
unnecessary inventory

Abstract

Each Production Process must have a shortage that may not have very short-term effects but in the long run waste can disrupt the effectiveness of the resources in the company. Minimizing waste in the production process is one of the goals of a company. Value stream mapping is one of the lean methods that can minimize waste in the production process. In this study, the method used to reduce production time at PT. TBA.is a fishbone and Value Stream Mapping (VSM). VSM is used to see the condition of production time in the company. To look for waste in the use of fishbone and to reduce it using line balancing. Found 2 line balancing that is unnecessary motion and unnecessary inventory. With this method we know the total cycle time of 69.06 minutes and the company can reduce 43.4% or 30 minutes of lead time from the total cycle time.

https://doi.org/10.21512/ijobex.v3i1.7128
PDF
Dimensions

References

Coccia, M. (2017). The fishbone diagram to identify, systematize and analyze the sources of general purpose technologies. Social and Administrative Sciences, 4, 291-303.

Ghushe, S., Deshmukh, S., Basgoti, V.. Yawale, Y., Gangasagar, P. and Duryodhan, N. S. (2017). Implementation of value stream mapping in a coir product manufacturing industry. International Research Journal of Engineering and Technology, 4(4), 457-460.

Kader, M. S. and Akter, M. M. K. (2014). Analysis of the factors affecting the lead time for export of readymade apparels from Bangladesh; proposals for strategic reduction of lead time. European Scientific Journal, 10(33), 268-283.

Pandya, N., Kikani, P. and Acharya, G. D. (2017). Analyze the value stream mapping for lead time reduction by lean: A review. Journal of Industrial Safety Engineering, 1-4.

Parvez, M., Amin, F. B. and Akter, F. (2017). Line balancing techniques to improve productivity using work. IOSR Journal of Research & Method in Education, 7(3), 7-14.

Wavhal, S. K., Mahadik, S. S., Angre, A. A., Shedge, U. K. and Kashikar, A. (2017). A review on optimization of cycle time by using various technique. International Journal of Engineering Development, 5(1), 723-725.

Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

Copyright (c) 2020 Array

Plum Analytics