PENGUKURAN RESIKO Teknologi Informasi (TI) DENGAN METODE OCTAVE-S

Authors

  • Anderes Gui Jurusan Komputerisasi Akuntansi, Fakultas Ilmu Komputer, Universitas Bina Nusantara, Jln. K.H. Syahdan No.9, Palmerah, Jakarta Barat 11480
  • Sanyoto Gondodiyoto Jurusan Komputerisasi Akuntansi, Fakultas Ilmu Komputer, Universitas Bina Nusantara, Jln. K.H. Syahdan No.9, Palmerah, Jakarta Barat 11480
  • Irvan Timotius Jurusan Komputerisasi Akuntansi, Fakultas Ilmu Komputer, Universitas Bina Nusantara, Jln. K.H. Syahdan No.9, Palmerah, Jakarta Barat 11480

DOI:

https://doi.org/10.21512/commit.v2i1.489

Abstract

Article presented a measurement of Information Technology (IT) risk levels and identify security practices which
were suitable in the risk overcoming, as noted in PTNL. Company was also expected to be more alert to the risk impacts
of information technology which might occur in PTNL. Analytical method used was OCTAVE-S method. This method was
used in a risk measurement of information technology risk, with some steps which had important roles in searching for the
measurement results effectively and efficiently, which were applied in PTNL. The results which will be achieved were to give
overall results of risk measurement occurred at the company, either the plus or minus, and provide recommendations which
are expected to solve and correct the minus or problems which occurred in PTNL. Conclusion states that the risk measurement
of information technology performed in PTNI has successfully minimized the risks that can threaten the company’s security.
Keywords: measurement, risk, Information Technology (IT), OCTAVE-S method