Purba, H. H. “Reducing The Operational Stop Time of Hauller Komatsu Hd465-7 by Using the Six Sigma’s Approach in PT X”. ComTech: Computer, Mathematics and Engineering Applications, vol. 7, no. 2, June 2016, doi:10.21512/comtech.v7i2.2245.