Santoso, G. E., Ayu, G. and Septivani, N. (2013) “Lean Strategy Implementation to Improve Throughput in Assembly Line: Dul-Db21ssc Manufacturing Process at PT. X”, ComTech: Computer, Mathematics and Engineering Applications, 4(1), pp. 371-380. doi: 10.21512/comtech.v4i1.2749.