Purba, H. H. (2016) “Reducing The Operational Stop Time of Hauller Komatsu Hd465-7 by Using the Six Sigma’s Approach in PT X”, ComTech: Computer, Mathematics and Engineering Applications, 7(2). doi: 10.21512/comtech.v7i2.2245.