[1]
Purba, H.H. 2016. Reducing The Operational Stop Time of Hauller Komatsu Hd465-7 by Using the Six Sigma’s Approach in PT X. ComTech: Computer, Mathematics and Engineering Applications. 7, 2 (Jun. 2016). DOI:https://doi.org/10.21512/comtech.v7i2.2245.