[1]
Purwosri, V.P. et al. 2025. Designing School Building Maintenance Priorities Using the Cost-User Effectiveness Ratio. ComTech: Computer, Mathematics and Engineering Applications. 16, 1 (Jun. 2025), 67–79. DOI:https://doi.org/10.21512/comtech.v16i1.12385.