Analisis Faktor-faktor Perubahan Design Terhadap Proyek Konstruksi Pelebaran Jalan Tol Jakarta-Merak (Area Cikupa)

Authors

  • Yunita Dian Suwandari Mercubuana University
  • Oties T. Tsarwan Mercubuana University

DOI:

https://doi.org/10.21512/emacsjournal.v2i3.6561

Keywords:

Toll Road, Construction, Project Delay, Design Changes, SPSS

Abstract

In every project, job changes are always happening and almost unavoidable. One of the factors that influence job change is a design change. This study analyzes the design changes that have caused delays in the Jakarta-Merak toll road widening project in the Cikupa area—collecting data using literature studies and questionnaires with five Linkert scales. The analysis used SPSS version 22. The research finding is five variables of design changes and changes due to the land’s location to be used as a project, which are the leading causes of changes in this project’s design.

Dimensions

Plum Analytics

Author Biographies

Yunita Dian Suwandari, Mercubuana University

Fakultas Teknik - Jurusan Teknik Sipil

Oties T. Tsarwan, Mercubuana University

Fakultas Teknik - Jurusan Teknik Sipil

References

Boon, J., Yap, H., Tunku, U., Rahman, A., Abdul-rahman, H., & Wang, C. (2015). Impacts Of Design Changes on Construction Project Performance : Insights From A Literature Review, (November).

George Lois (2018). Analisis Faktor yang Berpengaruh Terhadap Keterlambatan Proyek Pelebaran Jalan Tol Tangerang-Merak & Simpang Susun Cikupa Paket 2

Indonesia, U., Ariefasa, R., Teknik, F., Studi, P., Sipil, T., & Konstruksi, K. M. (2012).

Kasus, S., Jalan, P., & Trans, T. O. L. (2016). Analisis Risiko Keterlambatan Waktu Pada Proyek Pembangunan Jalan Tol Trans Sumatra. University lampung.

Khahro, S. H., Ali, T. H., & Akhund, M. A. (2017). Effect Of Change Orders On Project, (January 2018).

Kristiana, R. (2017). Identifikasi Penyebab Risiko Keterlambatan Proyek Konstruksi Bangunan Gedung Tinggi Hunuian ( Studi Kasus : Proyek Pembangunan Condotel Dan Apartemen Bhuvana Resort Ciawi , Bogor ).

Love,P.E.D. et al., 2002. Using system dynamic to better understand change and rework in contruction project management system. International of Project Management, 20 (6), pp.425-436

Najah, A., Pontan, D., Studi, P., Sipil, T., Metode, M., Deskriptif, S.Daerah, P. (2018).Identifikasi Peringkat Faktor penyebab Keterlambatan, 133–140.

Pmbok 5th edition, 2016

Sulaiman, M. (2017). Analisis penyebab keterlambatan pelaksanaan proyek ditinjau dari waktu pelaksanaan di provinsi aceh 1), 1, 405–418.

Downloads

Published

2020-09-30

Issue

Section

Articles
Abstract 480  .
PDF downloaded 877  .