Analisis Faktor-faktor Perubahan Design Terhadap Proyek Konstruksi Pelebaran Jalan Tol Jakarta-Merak (Area Cikupa)

Authors

  • Yunita Dian Suwandari Mercubuana University
  • Oties T. Tsarwan Mercubuana University

DOI:

https://doi.org/10.21512/emacsjournal.v2i3.6561

Keywords:

Toll Road, Construction, Project Delay, Design Changes, SPSS

Abstract

In every project, job changes are always happening and almost unavoidable. One of the factors that influence job change is a design change. This study analyzes the design changes that have caused delays in the Jakarta-Merak toll road widening project in the Cikupa area—collecting data using literature studies and questionnaires with five Linkert scales. The analysis used SPSS version 22. The research finding is five variables of design changes and changes due to the land’s location to be used as a project, which are the leading causes of changes in this project’s design.

Dimensions

Author Biographies

Yunita Dian Suwandari, Mercubuana University

Civil Engineering Department, Faculty of Engineering

Oties T. Tsarwan, Mercubuana University

Civil Engineering Department, Faculty of Engineering

References

Aslam, M., Baffoe-Twum, E., & Saleem, F. (2019). Design Changes in Construction Projects – Causes and Impact on the Cost. Civil Engineering Journal, 5(7), 1647–1655. https://doi.org/10.28991/cej-2019-03091360

Boon, J., Yap, H., Tunku, U., Rahman, A., Abdul-rahman, H., & Wang, C. (2015). Impacts Of Design Changes on Construction Project Performance : Insights From A Literature Review. November.

Bruno, L. (2019). Faktor – Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi di Surabaya. Journal of Chemical Information and Modeling, 53(9), 1689–1699. https://doi.org/10.1017/CBO9781107415324.004

Kristiana, R. (n.d.). Identifikasi Penyebab Risiko Keterlambatan Proyek Konstruksi Bangunan Gedung Tinggi Hunuian ( Studi Kasus : Proyek Pembangunan Condotel Dan Apartemen Bhuvana Resort Ciawi , Bogor ).

Lois, George (2018) Analisis Faktor Yang Berpengaruh Terhadap Keterlambatan Proyek Pelebaran Jalan Tol Tangerang - Merak & Simpang Susun Cikupa Paket 2. S1 Thesis, Universitas Mercu Buana Jakarta

Palulun, Y., Pratasis, Pi. A. k, Mangare, J. B., & Manado, R. (2017). Keterlambatan Pada Proyek Jalan Di ( Provinsi Sulawesi Utara ). Jurnal Sipil Statik Vol. 5 No.7, 5(7), 451–464.

Sandyavitri, A. (2008.). Terhadap Waktu Dan Biaya Pekerjaan Konstruksi. 9(i), 57–70.

Yana, A. A. G. A., Rusdhi, H. A., & Wibowo, M. A. (2015). Analysis of factors affecting design changes in construction project with Partial Least Square (PLS). Procedia Engineering, 125, 40–45. https://doi.org/10.1016/j.proeng.2015.11.007

Yap, J. B. H., Abdul-Rahman, H., & Wang, C. (2016). A Conceptual Framework for Managing Design Changes in Building Construction. MATEC Web of Conferences, 66. https://doi.org/10.1051/matecconf/20166600021

Downloads

Published

2020-09-30

How to Cite

Suwandari, Y. D., & Tsarwan, O. T. (2020). Analisis Faktor-faktor Perubahan Design Terhadap Proyek Konstruksi Pelebaran Jalan Tol Jakarta-Merak (Area Cikupa). Engineering, MAthematics and Computer Science Journal (EMACS), 2(3), 129–131. https://doi.org/10.21512/emacsjournal.v2i3.6561

Issue

Section

Articles
Abstract 798  .
PDF downloaded 1333  .