Browse Title Index


 
Issue Title
 
Vol 12, No 2 (2011): INASEA Vol. 12 No. 2 ANGAN PROGRAM APLIKASI SISTEM DISTRIBUSI DENGAN METODE SAVING MATRIX SEBAGAI DASAR KEPUTUSAN PEMBELIAN ARMADA (STUDI KASUS: PT KABELINDO MURNI TBK.) Abstract   PDF
Christine Natalia, Dicky Dicky
 
Vol 8, No 2 (2007): INASEA Vol. 08 No.2 APLIKASI SIMULASI UNTUK PERAMALAN PERMINTAAN DAN PENGELOLAAN PERSEDIAAN YANG BERSIFAT PROBABILISTIK Abstract   PDF
Bambang Sugiharto
 
Vol 6, No 2 (2005): INASEA Vol. 06 No. 2 AUDIT KINERJA PROSES PENGOLAHAN PADA PABRIK GULA Abstract   PDF
Nyimas Dewi Sartika
 
Vol 10, No 1 (2009): INASEA Vol. 10 No. 1 AUTONOMOUS MAINTENANCE UNTUK MENINGKATKAN PRODUKTIVITAS PRODUKSI DI PILOT LINE FACTORY 4 Abstract   PDF
Iwan Budihardjo, Dian Marisa
 
Vol 12, No 2 (2011): INASEA Vol. 12 No. 2 BACKORDER RAW MATERIAL INVENTORY CONTROL SYSTEM WITH LEAD TIME AND ORDERING COST REDUCTION: CASE STUDY PT ICI PAINTS INDONESIA Abstract   PDF
Tiena Gustina Amran, Dinar Suryo Lesmono
 
Vol 11, No 2 (2010): INASEA Vol. 11 No. 2 BASIC SUPPLY CHAIN BAWANG MERAH (ALLIUM ASCALONICUM L) DI KABUPATEN BANTUL DAERAH ISTIMEWA YOGYAKARTA DARI PERSPEKTIF SISTEM DINAMIS Abstract   PDF
Kuncoro Harto Widodo, Dewi Rembulan
 
Vol 14, No 1 (2013): INASEA Vol. 14 No. 1 BENCHMARKING AND CONFIGURATION OF OPEN-SOURCE MANUFACTURING EXECUTION SYSTEM (MES) APPLICATION Abstract   PDF
Ganesha Nur Laksmana, Prianggada Indra Tanaya, Yuki Indrayadi
 
Vol 10, No 2 (2009): INASEA Vol. 10 No. 2 BIAYA DAN MANFAAT PENGADAAN PROGRAM ASTRA DAIHATSU PRODUCTION PLANNING SYSTEM (ADPPS) DI PT ADM Abstract   PDF
Gunawarman Hartono
 
Vol 14, No 2 (2013): INASEA Vol. 14 No. 2 DEVELOPING PROPOSED LAYOUT FOR INCREASING LINE EFFICIENCY ON BODYSHOP Abstract   PDF
Johan Oscar Ong, Cornelia Cornelia
 
Vol 10, No 1 (2009): INASEA Vol. 10 No. 1 EFISIENSI PENGGUNAAN LIQUID PHOTO POLYMER PADA PROSES PRA PRODUKSI KEMASAN KARTON BOX MENGGUNAKAN METODE PLAN DO STUDY ACTION (PDSA) Abstract   PDF
Latifah Dieyinah, Ardhini Ardhini
 
Vol 8, No 2 (2007): INASEA Vol. 08 No.2 EL SIMULASI SISTEM PELAYANAN RESTORAN YURAKU KOMPLEK D’BEST KELAPA GADING Abstract   PDF
Ronald Sukwadi
 
Vol 6, No 2 (2005): INASEA Vol. 06 No. 2 EVALUASI DAN PERUMUSAN STRATEGI TELKOM FLEXI DENGAN MENGGUNAKAN MODEL DAVID Abstract   PDF
Anggara Hayun A.
 
Vol 11, No 1 (2010): INASEA Vol. 11 No. 1 EVALUASI KEKUATAN DAN STRUKTUR MIKRO SAMBUNGAN LAS TIG PADA PIPA ZIRCONIUM Abstract   PDF
B. Bandriyana, Maradu Sibarani
 
Vol 15, No 1 (2014): INASEA Vol. 15 No. 1 EVALUASI KONDISI LINGKUNGAN KERJA PADA BAGIAN PROSES PENGECORAN DI INDUSTRI KERAJINAN COR ALUMUNIUM PT “ED” YOGJAKARTA Abstract   PDF
Titin Isna Oesman
 
Vol 5, No 1 (2004): INASEA Vol. 05 No. 1 EVALUASI PELAKSANAAN SMK3 DI PT IKPP MENURUT KEBIJAKAN PEMERINTAH Abstract   PDF
Rinaldi Rahadian, Bagus HJ
 
Vol 5, No 1 (2004): INASEA Vol. 05 No. 1 IDENTIFIKASI DAN SIMULASI FAKTOR PENYEBAB CACAT PRODUK BOTOL KONTAINER DENGAN METODE SIX SIGMA PADA PT INDOVASI PLASTIK LESTARI Abstract   PDF
R. Phenter S. P., Faisal Safa
 
Vol 6, No 2 (2005): INASEA Vol. 06 No. 2 IDENTIFIKASI KARAKTERISTIK ORGANISASI YANG DOMINAN DALAM MANAJEMEN RUMAH SAKIT TNI-AU TINGKAT-II : STUDI KASUS RS Dr. M. SALAMUN BANDUNG Abstract   PDF
Evo S. Hariandja
 
Vol 9, No 2 (2008): INASEA Vol. 09 No. 2 IMPLEMENTASI PRINSIP KERJA 5S PADA BAGIAN PABRIKASI I UNTUK MENINGKATKAN EFISIENSI WAKTU PRODUKSI Abstract   PDF
Gunawarman Hartono, Fanni Abdillah Suntantyo
 
Vol 13, No 1 (2012): INASEA Vol. 13 No. 1 IMPLEMENTASI PROGRAM KOMPUTASI ALGORITMA KESEIMBANGAN LINTASAN PERAKITAN Abstract   PDF
Prudensy F. Opit, Marsella T. Kornelis, Karunia A. Mahardini
 
Vol 9, No 2 (2008): INASEA Vol. 09 No. 2 IMPLEMENTASI SISTEM DINAMIK PADA PENGEMBANGAN POLA KEMITRAAN INDUSTRI KECIL DAN MENENGAH DI DKI JAKARTA Abstract   PDF
Fajar Kurniawan
 
Vol 14, No 1 (2013): INASEA Vol. 14 No. 1 IMPLEMENTING ECONOMIC ORDER INTERVAL FOR MULTIPLE ITEMS TO REDUCE TOTAL INVENTORY COST Abstract   PDF
Anastasia L. Maukar, Johan Oscar Ong, Yoshua Christananta
 
Vol 10, No 1 (2009): INASEA Vol. 10 No. 1 IMPLEMENTING VALUE STREAM MAPPING (VSM) ON PRODUCTION PROCESS OF BLANK CYLINDER HEAD AT PT X Abstract   PDF
Gunawarman Hartono, Dendi Prajadhiana, Syarif Nurhidayat
 
Vol 5, No 2 (2004): INASEA Vol. 05 No. 2 INCUBATOR BUSINESS IN A UNIVERSITY Abstract   PDF
Andre M. R. Wajong
 
Vol 11, No 2 (2010): INASEA Vol. 11 No. 2 INFORMATION SYSTEM DEVELOPMENT FOR JOB SCHEDULING AND PROGRESS UPDATE TO PROVIDE REAL TIME INFORMATION IN SOFT GOOD ENGINEERING DEPARTMENT, A CASE STUDY Abstract   PDF
Ketut Gita Ayu, Fauzi Wihardi
 
Vol 9, No 1 (2008): INASEA Vol. 09 No. 1 INTEGRASI PERENCANAAN PRIORITAS DAN KAPASITAS SISTEM MRP II DENGAN SISTEM KANBAN MENGGUNAKAN PROMODEL Abstract   PDF
Budi Aribowo, Natasari -
 
26 - 50 of 135 Items << < 1 2 3 4 5 6 > >> 


ISSN: 1411-9129